Survival Bill
The Shed

The start finding a large enough cleared spot to start the shed I did this on the
cheep using presser treated ties for the base and used some concrete bricks to
level it out.

That 1 gal paint can held all the nails to build the shed I did not believe it myself
3" common nails for 2x4s 2-1/4" ring nails for 1/2"plywood floor and 3/8 plywood for walls
also used some spiral nails for the plywood but already noticed them backing out
so do not use on your projects. 1-1/2 roofing nails for roofing shingles

all floor joist done now for the plywood floor

looks like a floor to me.

front wall up and back wall being built on the floor

all walls up at this point

Complete with door I ended up short 3 roofing shingles and had to go to
town the next day to get them in all it took me 5 days to build the shed.
will be painting/staining it dark brown to help blend it in...

------painted shed-----
-----Folding exterior work table-----